Connecting Valve Wiring - Toro Custom Command 36 Station Manual Del Usaurio

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Caution: Do not connect
the controller to one phase of a
three-phase power supply used by a
pump or other electrical equipment.
3. Remove the cover plate installed
directly below the transformer. Use a
small flat blade screwdriver to secure
the wires.
For 120 V a.c. models, secure the
wires as follows: Line (black wire) to "L", Neutral (white wire) to
"N" and Equipment Ground (green) to "
For 230–240 V a.c. models, secure wires as follows: Line (brown)
to "L", Neutral (blue) to "N" and Equipment Ground (green) to "
Reinstall the cover plate.
4. Apply power to the controller.
CONNECTING THE VALVE WIRING
1. To provide a field common wire, attach one wire to either solenoid
lead of all sprinkler valves and master valve (optional).
2. Attach a separate control wire to the remaining solenoid lead of
each valve. Label the control wires with the intended station
number for identification at the controller.
Caution: All wiring splices must be waterproofed to prevent
short circuits and corrosion.
Figure 4
Pump Start
Relay
or
Master Valve
Installation Procedures
". See Figure 7.
MV/
1
2
3
4
5
6
7
8
9 10 11 12
PUMP
MV/
1
2
3
4
5
6
7
8
9 10 11 12
PUMP
Valve Station 3
Valve Station 2
Valve Station 1
".
VC/
VC/
13 14 15 16 17 18 19 20 21 22
COM
COM
VC/
VC/
13 14 15 16 17 18 19 20 21 22
COM
COM
Valve
Common
21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Custom command 48 station

Tabla de contenido