c. Before storing, drain all fuel from the unit. Start engine and allow to run until it
stops.Clean the unit before storing. Pay particular attention to the air intake
area, keeping it free of debris. Use a mild detergent and sponge to clean the
plastic surfaces.
d. The petrol mix should be changed every two months.
ASSEMBLY
INSTALLING GUIDE BAR AND SAW CHAIN
A standard saw unit package contains the
items as illustrated
1. Power unit
2. Bar protector
3. Guide bar
4. Saw chain
5. Plug wrench
6. Screwdriver
Open the box and install the guide bar and
the saw chain on the power unit as follows:
WARNING!
The saw chain has very sharp edges. Use thick protective gloves for safety.
a. Pull the guard towards the front handle to check that the chain brake is not
on.
b. Loosen the nuts and remove the chain cover. (remove the adjustment cover)
c. Gear the chain to the sprocket and,
while fitting the saw chain around the
guide bar, mount the guide bar to the
power unit. Adjust the position of chain
tensioner nut on the chain cover to the
lower hole of guide bar.
1. Hole
2. Tensioner nut
3. Chain cover
4. Protector
1
2
3
4
4
58
5
1
3
6
2