Servicing; Shutting Down/Dismantling; Disposal And Returns - RK Rose+Krieger E-II Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7. Working life

7.4 Servicing

Before starting any work on the linear unit, any electrical drives used are to be pro-
tected against accidental switching on.
All linear units are provided in the factory with the required lubricant quantities. Servicing inter-
vals are dependent on the hours run, the stressing and environmental factors.
Lubrication is applied directly to spindles.
Recommended lubricant: off the shelf roller bearing greases, which must not be mixed with each
other.
Lubricating interval: every 200-500 hours run

7.5 Shutting down/dismantling

Before starting any work on the linear unit, any electrical drives used are to be pro-
tected against accidental switching on.
If a linear unit is installed in an oblique or vertical position, the guidance slot drive must be secured
against slipping during dismantling. The system is to be freed from any loads or forces.
Following a collision, the threaded spindle and the guide nut have to be replaced - even if there is
no visible damage. Spare parts information is to be taken from the spare parts list for the relevant
linear unit type.

7.6 Disposal and returns

The linear unit must either be disposed of in an environmentally friendly way according to the ap-
plicable policies and regulations, or returned to the manufacturer.
The manufacturer reserves the right to charge for disposing of this linear unit.
50

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

E-ii stainless steel

Tabla de contenido