Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 46
5.6.

CONTINUITY TEST

Before performing the continuity test, remove power from the circuit under
test and discharge all capacitors.
1. Perform the preliminary Autotest function (see § 4.4)
2. Connect the L1 and L2 probes to the object under test (see Fig.9)
3.
Continuity test is active for resistance
LED "
, the "Con" message is displayed and the buzzer sounds continuously
"
indicating a positive test
4. The meter automatically turns on when the two probes are separated from the
measured object
5. Press the
/ key to activate/deactivate the white LED torch
CAUTION
Fig. 9: Continuity test
<400k. The meter turns automatically on with
EN - 13
HT10

Publicidad

Tabla de contenido
loading

Tabla de contenido