6.6
Installation and commissioning certificate
Data shown on the type plate:
Type:
Manufacturing number:
This device has been installed and commissioned in accordance with the instructions provided in the operating manual. The
settings in the controller match the local conditions.
Note!
When any factory-set values of the device are changed, you must enter this information in the Maintenance
certificate, see chapter 10.3 "Maintenance certificate" on page 27 .
For the installation
Place, date
For the commissioning
Place, date
7
Commissioning
Note!
Confirm that installation and start-up have been carried out correctly using the installation, start-up and
maintenance certificate. This action is a prerequisite for the making of warranty claims.
–
Have the Reflex Customer Service carry out commissioning and the annual maintenance.
Note!
The app guides you through commissioning see chapter 9.1 "Reflex Control Smart" on page 22
7.1
Requirements for initial commissioning
The device will be ready for commissioning when the tasks described in the "Installation" chapter have been completed.
•
The device has been mounted.
•
The connections of the device to the system has been created and the facility system pressure maintenance is operational.
–
Degassing line to the facility system.
–
Degassing line from the facility system.
•
The water-side connection of the device to the make-up has been created and is operational, if automatic make-up is
required.
•
The connection pipes of the device have been purged and cleaned of welding residue and dirt before commissioning.
•
The entire system is filled with water and all gases have been vented in order to ensure a circulation through the entire
system.
•
The electrical connection has been created according to applicable national and local regulations.