Leak Low-Pressure Liquid Gas Fittings Test Pursuant To 1; Leakage Test For Drinking Water Systems Of Domestic Connections Using Air Pressure; Initial Test Of Drinking Water Systems Of Domestic Connections - Rothenberger ROTEST GW 150/4 Instrucciones De Uso

Ocultar thumbs Ver también para ROTEST GW 150/4:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 32
5.1.3

Leak low-pressure liquid gas fittings test pursuant to 1*

Complete test as follows:
Close all cut-off valves on your ROTEST GW 150/4.
Insert connecting hose (6) to connecting valve B. An auditable sound is heard when hose
and valve nipple are properly locked.
Insert an appropriate test plug into the open end of the pipe and seal off end by turning the
wing nut until the pipe is sealed tight.
Insert the open end of the connecting hose (6) to the valve on the test plug.
Assemble tube element system as follows:
while carefully turning insert tube element (8) with scale 40 - 60 mbar into fixed tube
-
element (7).
Seal off the hose end of the bellow (12) by sliding end over connecting valve C on the
water tank.
Open connecting valves B, C and D.
Use bellow (12) to load a pressure pursuant to 1* into the test system.
Close connecting valve C to avoid a loss in pressure.
Wait 10 minutes for loaded air and water temperatures to equalize.
Prolong 10-minute period of temperature equalization if temperatures fluctuate
greatly. The equalization period can last up to two hours!
Carry out the test over a period prescribed by 1*. Over this period the pressure indicated must
not drop.
5.2
Leakage test for drinking water systems of domestic connections
using air pressure 1*
Leakage tests can be carried out on the following pipe systems including the approved joint
systems using air pressure pursuant to 1*:
-
copper pipe systems as per DIN 1786/GW 2;
-
hot galvanized steel pipe systems as per DIN 2440 and joints as per DIN 2999;
non-rusting steel types and the respective tube pressure joints pursuant to 1*;
-
-
plastic pipe systems made of PE-X, PVC-C, PP-R, PB;
-
multilayer pipe systems.
5.2.1

Initial test of drinking water systems of domestic connections

Complete test as follows:
Close all cut-off valves on your ROTEST GW 150/4.
Insert connecting hose (6) to connecting valve A. An auditable sound is heard when hose
and valve nipple are properly locked.
Screw inch adapter 2* into pipe system.
Insert open end of the connecting hose (6) to inch adapter 2*. An auditable sound is heard
when hose and adapter nipple are properly locked.
Use hand pump (3) to load a pressure pursuant to 1* into the test system
Wait 10 minutes for loaded air and water temperatures to equalize.
Prolong 10-minute period of temperature equalization if temperatures fluctuate
greatly. The equalization period can last up to two hours!
Carry out the test over a period prescribed by 1*. Over this period the pressure indicated must
not drop.
1) Statutory regulations in the country of use or the respective manufacturer and facility instructions and guidelines
2) Extra accessory. Must be ordered separately. Order number 6.1067
ENGLISH
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

6.10396.10406.1045

Tabla de contenido