Closing The Enclosure; Securing The Enclosure - Mettler Toledo IND246 Guia De Instalacion

Ocultar thumbs Ver también para IND246:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 47
IND246 Terminal Installation Manual
Capacity Label

Closing the Enclosure

After all work has been completed inside the terminal, the enclosure must be
snapped shut properly to maintain its environmental integrity.
To properly close the terminal, follow these steps:
1. Position the front cover over the rear housing then gently press it down into
place.
2. Press down firmly in each of the four corners of the front cover in sequence
until each corner clip snaps audibly snaps into place.
3. It is very important that each of the 4 corner clips have snapped into place.
When pressing down on the cover during installation, listen for the "click"
sound of each clip engaging.

Securing the Enclosure

When the IND246 terminal is used in a metrologically "approved" application, it
must be protected from tampering by use of a seal. A wire security seal is included
with the terminal.
For sealing details of the IND246 terminal, refer to Figure 2-36 and follow these
steps:
1. Ensure that the appropriate approval region has been selected in setup under
Scale > Type > Approval, and that the Metrology security switch SW1-1 is in
its ON position (refer to Figure 2-31 and Table 2-4).
2. With the front panel installed on the enclosure and snapped into place, thread
the free end of the wire seal through either the left or right hole in the IND246
front panel, and through the hole in the retaining clip.
3. Thread the end of the wire cable through the hole in the plastic seal (as shown
in Figure 2-36), remove any remaining slack in the wire, and snap the seal
shut.
2-22
in Place
Figure 2-35: Capacity Label Installed

Publicidad

Tabla de contenido
loading

Tabla de contenido