7.5 Connecting the controller / manual control switch
Details for configuring, operating the controller via the manual control switch as well as fault co-
des can be obtained in the controller operating instructions.
7.5.1 Lambda Colonne with external controller: function Up - Down
The lifting column is connected to the external controller.
Maximum three lifting columns can be traversed one after another.
The following external controllers can be exempted:
•
Transformer controller for LAMBDA Colonne (LBC) / LAMBDA E-Cylinder (LBM) 1 controllable
drive
•
Transformer controller for LAMBDA Colonne (LBC) / LAMBDA E-Cylinder (LBM) up to 2 drives,
can be controlled separately or parallel
•
Transformer controller for LAMBDA Colonne (LBC) / LAMBDA E-Cylinder (LBM) up to 3 drives,
can be controlled separately or parallel
Connecting the manual control switch
The manual control switch is connected directly to the controller.
•
Six-button manual control switch, Lambda manual control switch, for traversing the lifting co-
lumn individually or parallel.
Parallel run
With the standard version, two lifting columns can be traversed parallel (no synchronisation).
When operating, this can result in different lifting positions. The lifting positions are equalled-out
by moving to the end positions.
7. Life Phases
49