ASSEMBLY
STEP 3
BAG
:
]
HARDWARE
3 CONTENTS
BOLT
(D)
SPRING
WASHER
(B)
/_-_
FLAT WASHER
(C)
45 turn
15 turn
_
15 rnm
Qty: 4
Qty: 4
Qty: 4
GS950T,
T101 CONSOLE
CT7,1,
T102, T103
CONSOLE
CONSOLE
CABLES
ASSEMBLE
LEFT SiDE
FIRST
,®
FLAT WASHERS
(C)
'_ <_
SPRING
WASHERS
(B)
, <_
BOLTS
(D)
CONSOLE
MAST
B
C
Disengage
the DECK LOCK LATCH with your
foot to lower the RUNNING
DECK.
Open
HARDWARE
BAG 3.
Gently place the CONSOLE
on top of the
CONSOLE
MASTS. Attach the LEFT SiDE first
using 2 BOLTS (D), 2 SPRING
WASHERS
(B)
and 2 FLAT WASHERS
(C).
Connect the CONSOLE CABLES, carefully
tucking wires in masts to avoid damage.
Attach the RIGHT SIDE of the CONSOLE
using
2 BOLTS (D), 2 SPRING
WASHERS
(B) and 2 FLAT WASHERS
(C).
NOTE: Be careful not to pinch any wires
while assembling the masts.
YOU ARE FIN ISH ED !