Installation Measures - V2 ZARISS Serie Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.2 - INSTALLATION MEASURES

To carry out a proper installation of the operator parts as well as
to ensure the best automation performance, the measurement
levels shown in the following table shall be complied with.
Change the gate structure to adapt it to one of the cases in the
table, if necessary.
1. Depending on the opening angle of the leaves or panels, make
sure it is possible to respect the dimensions reported in the
table
2. Measure the value of B on-site
3. Based on the value for dimension B and the opening angle of
the leaves or panels, the value of A, C, D may be deduced from
the table
m
PLEASE NOTE: ensure there are no obstacles near
the motor that might interfere with the arm, both during
movement and with the gate open.
B
0 ÷ 60
60 ÷ 150
150 ÷ 180
90°
180 ÷ 210
210 ÷ 230
230 ÷ 250
B
0 ÷ 50
50 ÷ 100
100 ÷ 130
100°
130 ÷ 150
150 ÷ 170
170 ÷ 200
B
0 ÷ 20
20 ÷ 30
30 ÷ 40
50 ÷ 60
110°
60 ÷ 70
70 ÷ 80
80 ÷ 90
90 ÷ 110
A
120
130
140
150
160
170
A
170
180
180
180
190
200
A
210
220
230
240
250
260
270
280
- 40 -
C
450
480
500
500
500
500
C
540
560
570
580
580
580
C
610
620
630
630
630
650
660
660
D
615
590
570
550
530
510
D
590
550
545
540
520
500
D
545
525
510
500
485
475
465
450

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Zariss-mZariss-sZariss-l

Tabla de contenido