Installation - RK Rose+Krieger MultiControl duo Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7. Working life

7.2 Installation

7.2.1 General
The controller is only to be fixed at the points laid down for the installation.
Layout of electrical leads
When laying out electrical leads, ensure that
these cannot be crimped,
no mechanical load is exerted on them,
they are undamaged in any other way and
obstacles do not pose any risks to persons.
52

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Multicontrol duo silentMulticontrol quadro

Tabla de contenido