7. Working life
7.5.2 Performing an initialisation run
The initialisation run can be performed as follows with any hand switch if error E000,
E010 or E021 is present:
Error messages will only be indicated on the 6-key hand switch!
•
Ensure that all drives and controllers are interconnected and that the mains plug is not con-
nected. If you have pulled out the mains plug to perform an initialisation run, wait for at least
30 seconds before plugging it back in.
•
Keep the DOWN
•
Plug the mains plug in and wait for about 5 seconds.
Note: The software release (e.g. "0217"), the type of lifting column connected (e.g. "-20-")
and "[In d]" appears in hand switches with display.
•
Release the DOWN
•
Press the DOWN
lower end stop.
Note: When the lower end stop is reached, "[In U]" appears in the display.
•
Press the UP
key and keep it pressed until all drives have moved to the upper end stop.
Should it be impossible to reach the top end stop, the initialisation run can be ended in any po-
sition by keeping the DOWN
the drives.
The initialisation run is complete. The controller is now ready for operation.
The operation of the 2-key or 6-key hand switch is described in sections 7.10 and 7.11.
62
key on the hand switch pressed.
key.
key again and keep it pressed until all drives have moved to or are at the
key pressed for 5 seconds. The position is the new end stop for