RK Rose+Krieger MultiControl duo Instrucciones De Montaje página 63

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

The initialisation run can be performed with any hand switch if no error is present:
2-key hand switch
Ensure that all drives and controllers are interconnected and that the mains plug is not con-
nected. If you have pulled out the mains plug to perform an initialisation run, wait for at least
30 seconds before plugging it back in.
Keep the DOWN
Plug the mains plug in and wait for about 5 seconds.
Release the keys.
Press the DOWN
lower end stop.
Press the UP
key and keep it pressed until all drives have moved to the upper end stop.
Should it be impossible to reach the top end stop, the initialisation run can be ended in any po-
sition by keeping the DOWN
the drives.
The initialisation run is complete. The controller is now ready for operation.
The operation of the 2-key or 6-key hand switch is described in sections 7.10 and 7.11.
and UP
keys on the hand switch pressed at the same time.
key again and keep it pressed until all drives have moved to or are at the
key pressed for 5 seconds. The position is the new end stop for
7. Working life
63

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Multicontrol duo silentMulticontrol quadro

Tabla de contenido