Installation Procedure - Toto Aquia TB416DD Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1) Verify that the TB6TR valve set has been installed according to the instructions and
leak tested before installing the bath faucet. Remove the three plaster guards from
the TB6TR valve set.
2) Remove the plug from the spout
shank of the TB6TR valve set
protruding from the finished
deck.
3) Loosen the set screw on the
back of the spout, and pull the
adapter out of the spout.
Tighten the adapter onto the
spout shank protruding from the
finished deck. Push the spout
onto the adapter, align with tub,
and secure by tightening the set
screw.
4) Tighten a valve stem to each
of the TB6TR valves protruding
from the finished deck using the
included screw and washer.
Using a pair of pliers, rotate the
cold (right) valve stem counter-
clockwise until it stops. Rotate
the hot (left) valve stem clock-
wise until it stops.

INSTALLATION PROCEDURE

4
Plug
Spout
Shank
Spout
Adapter
Spout
Shank
Screw &
Washer
Valve
Stem
Valve
Set
Screw

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Upton tb630dd

Tabla de contenido