Descargar Imprimir esta página

Heathrow Scientific Gusto Manual De Instrucciones página 8

Ocultar thumbs Ver también para Gusto:

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation
Remove the contents from the package examining them carefully for breakage, defects or
missing parts.
Place the product on a sturdy, level surface at least 300mm away from the edge of the
counter and other moving equipment. Make sure the AC power adapter and cords are clear
of hot surfaces and other hazards.
Make sure the product has ventilation and is not encased in any material that will limit
airflow. An overheating situation could occur.
Verify that the power switch in the back of the unit is in the OFF position. Plug the DC cord
into the rear of the unit and the AC cord into an approved outlet.
ONLY use Heathrow Scientific supplied power adapter and cords.
Prior to using
Before every use, inspect unit for cracks, missing pieces, and or any damage that would
result in an impaired performance and notify manufacturer BEFORE use.
Turn power switch on the rear ON. The unit will initialize.
Press the OPEN button. The lid should pop up slightly. Lift the front of the lid gently up and
backward until approximately 90 degrees vertical.
Remove any remaining packaging materials.
Verify that the rotor is installed correctly. (see section Rotor Installation and Removal) Do not
run without the rotor installed.
Close the lid.
Press the START/STOP button (rotor should spin up to the preset speed). If there is a smooth
whirring sound and the unit accelerates with little or no vibration, the mini-centrifuge is ready
to use. If there are loud or unusual sounds, or excessive vibration, DO NOT OPERATE.
Contact Heathrow Scientific service.
At the set time, the rotor will spin down, stop and the unit will emit a beep when the cycle is
complete.
General Operation
1.
Turn power switch on the back of the unit ON. The unit will initialize.
2.
To open lid, press the OPEN button. The lid should pop up slightly. Lift the front of the lid
gently up and backward until approximately 90 degrees vertical.
3.
On benchtop, prepare samples tubes in a rack so that tubes are filled to equal levels. Close
tube lids.
4.
Install tubes in the rotor in a balanced manner (see section - Balancing the Rotor).
5.
Set the appropriate time by pressing the TIME UP/DOWN button.
6.
Set the appropriate rpm by pressing the SPEED UP/DOWN button.
7.
Place the standard rotor cover on the rotor to limit noise and aspiration of liquids that may
escape from tubes.
8.
Close Lid and press down until locked (Display status should read "READY").
9.
Press START/STOP (rotor should spin up to the user set speed).
10. At a determined time the rotor will spin down and stop at the preset time.
11. The unit will then emit a beep when the cycle is complete.
12. To open lid, press the OPEN button.
8

Publicidad

loading

Este manual también es adecuado para:

Gusto hs10050Gusto hs10061