Unpack the Air Conditioner
WARNING
Excessive Weight Hazard
Use two or more people to move and install
air conditioner.
Failure to do so can result in back or other injury.
Remove packaging materials
Remove and properly dispose of packaging materials.
Remove tape and glue residue from surfaces before turning
on the air conditioner. Rub a small amount of liquid dish soap
over the adhesive with your fingers. Wipe with warm water
and dry.
Do not use sharp instruments, rubbing alcohol, flammable
fluids, or abrasive cleaners to remove tape or glue. These
products can damage the surface of your air conditioner.
Prepare Air Conditioner for Installation
Handle air conditioner with care.
Be sure your air conditioner does not fall out of the opening
during installation or removal.
The place where the power cord exits the air conditioner
should be no more than 4 ft (122 cm) from a grounded outlet.
1. Locate provided bags of screws.
2. Place the top channel on top of the air conditioner, lining up
the holes in top channel with the holes on top of air
conditioner.
3. Using 3 - #10 x ³⁄₈ in. pan-head screws, attach top channel to
air conditioner.
1. Top channel
2. #10 x ³⁄₈ in. pan-head screw
INSTALLATION INSTRUCTIONS
2
1
Install side curtains
NOTE: Attach curtains to unit before placing unit in window.
1. Insert curtain into curtain frame.
2. Push curtain in all the way.
3. Pull curtain toward open end of curtain frame.
4. Locate provided bag of 6 - #8 x ³⁄₈ in. pan-head screws.
5. Insert top and then bottom of right-hand curtain frame in top
and bottom curtain guides on air conditioner.
5