ABB ACS580-01 Serie Guía De Instalación Rápida página 10

Ocultar thumbs Ver también para ACS580-01 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 33
10 EN – Quick installation and start-up guide
(5b) and the phase conductors to the L1, L2 and L3 terminals. Tighten the screws
to the torque given in table
6. Install the EMC shroud separating the input and output cabling.
7. Reinstall the shroud on the power terminals.
8. Put the unused rubber grommets to the holes in the lead-through plate.
9. Secure the cables outside the unit mechanically.
10. Ground the motor cable shield at the motor end. For minimum radio frequency
interference, ground the motor cable shield 360 degrees at the lead-through of
the motor terminal box.
EN
DA
DE
ES
FI
FR
IT
NL
PT
RU
SV
TR
CN
D
(5c).

Publicidad

Tabla de contenido
loading

Tabla de contenido