GRE SAU150 Manual De Instrucciones página 23

Tabla de contenido

Publicidad

USERS MANUAL
SAUNA HEATERS
MODEL : 1202-21-1718
1202-30-1718
220 V 1N – 240 V 1 N
MOUNTING THE SAUNA HEATER
Remove two screws in the lower frontpart of the heater, this operation makes it possible to remove
the console from the heater. (see fig. 4)
Drill holes for fastening of the heater console. Use the console as guide for the drilling. Fasten the
supplied screws through the sauna room soft-wood lining into a 2 x 4 in. backing board to hold the
heater weight.
See fig. 1 and fig. 2 for he right distance to combustible materials.
LEFT- AND RIGHT- HAND MOUNTING
Depending on how your sauna is constructed you can have a need to operate your heater either from
the left or the right side. To make this easy the heater is symmetrical meaning that during the during
the installation you can choose on which side yu like to have the controls for easiest operation.
Place the heater on the console, find the fixing holes in the lower part of the heater body. Push the
heater gently in direction of the wall so that the lugs of the console fit into the fixing holes of the
heater. Check that all four lugs are in the right position, fasten the two locking screws in the front of
the heater (see fig. 4)
-
Only one sauna heater may be mounted in each room.
-
The wall behind the heater must not be covered with asbestos or eternite disks. This may
cause too high temperature rises in the wall material.
-
For wall and roof material, please use wood panelling.
PROTECTION GUARD
If you wish to build a protection guard around your heater the instructions in fig. 2 are to be
followed.
CONNECTION
The electrical connection has to be made by a qualified electrician in accordance with the
instructions.
For connection use rubber cable. At the bottom of the heater you will find the control panel, which
is also used as a junction box. In the junction box of the heater there are besides the connection
blocks even terminal blocks, which enable the following functions:
a)
A pilot light outside the sauna room (terminal block 2 and 5, see wiring diagram fig. 3. For
this connection please use wire of the same dimension as the connection wire for the
heater, see tab. 1)
b)
Remote locking of other heating equipment. (terminal block 2 and 6, see wiring diagram
3).
The junction box which is to be placed in the sauna room, has to be of splash-proof material and
have condensing water holes. The middle of the juncton box has to be place max. 500mm over the
floor.
E
2.1 kW
3.0 kW
7014204 314 SKMB 4 F
GB

Publicidad

Tabla de contenido
loading

Tabla de contenido