HYDAC International QHP Instrucciones De Servicio página 5

Acumuladores a pistón
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 14
4.1 Pre-charging procedure
A
I
D
H
G
B
WARNING:
Only suitably trained and competent
personnel shall carry out any
pre-charging.
NEVER LEAVE PRE-CHARGING
EQUIPMENT UNATTENDED DURING USE.
The following procedure must be
followed to ensure safe pre-charging of
the accumulators. All pre-charging
equipment should be supplied by QHP –
see catalogue for details.
• Release pressure from the fluid side of
the piston accumulator.
• Remove protective cap (5) and if fitted
gas valve sealing cap on assembly (3)
• Attach nitrogen regulator (A) to
nitrogen bottle (B)
• Ensure hand-wheel (E) on charging set
(C) is fully retracted, including pin.
• Fit charging set assembly (C) to accumu
lator gas valve (3)
• Connect charging hose (D) between
nitrogen regulator (A) and charging set
assembly (C)
• Check bleed (F) is fully closed.
Set nitrogen bottle gas regulator (A) to 25
psi.
E
C
F
3
NOTE
The Nitrogen Pressure Regulator Valve
shall have two gauges, one for the high
pressure (upstream) and one for the
reduced pressure (downstream). To avoid
overcharging due to incorrect setting, the
pressure-reducing device shall have a
maximum set pressure not exceeding the
maximum allowable pressure PS of the
accumulator.
To avoid overcharging by malfunction, the
pressure-reducing device shall be
equipped with a relief device limiting the
downstream pressure.
• Slowly turn hand-wheel (E) clockwise
one to one and a half turns to depress
the gas valve core.
• Open nitrogen cylinder valve (G) using
bottle key (H), gas pressure will be
indicated on the right hand gauge of the
regulator.
• Turn regulator handle (I) clockwise until
gas pressure register on the left hand
gauge. This pressure should be 10%
higher than the required pre-charge
pressure.
• Allow the gas pre-charge pressure to
stabilize, adjust if required.
• Check gas pre-charge pressure on
charging set assembly (C). When this is
equal to the pressure on the pressure
regulator, close nitrogen bottle valve
(G).
• If the pressure is too high, it can be
reduced via the bleed (F)
• Turn handle (E) on charging set
anticlockwise to seal gas valve (3).
• Open bleed valve (F) to vent gas from
charging valve (3).
• Remove charging assembly (C) and
GB
5

Publicidad

Tabla de contenido
loading

Tabla de contenido