SKYLOTEC Jackpod Davit Instrucciones De Uso página 28

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 69
4.3 DAVIT INSTALLATION & ADJUSTMENT
Install the davit into the sleeve on the base as shown in Figure 8, and check that the davit rotates freely
in the sleeve.
EN
Figure 8, Installation of Jackpod Davit LM Arm to Jackpod Base Portable
Adjust the offset of the davit as required for the job at hand by loosening the Clamp Knob, sliding the
Boom Extension Tube to the required position, and tightening the Clamp Knob to lock the Extension Tube
in place. Tighten the Clamp Knob until you hear and feel the internal ratchet click at least twice to ensure
proper engagement of the Overload Indicator.
Under all normal working loads, the Boom Extension Tube is locked in place when the Clamp Knob is
tightened. If system mis-use applies excessive load to the system, the Extension Tube slides back inside
the Receiver Tube to effectively shorten the arm and reduce loading to protect other parts of the system.
Movement of the Extension Tube under loading indicates that excessive force is being applied to the
system, and the activity causing the movement MUST BE stopped immediately.
28
2 PIECE
DAVIT

Publicidad

Tabla de contenido
loading

Tabla de contenido