EN
4.1 AUTOMATIC START-UP SEQUENCE
The purpose of the start-up sequence is to synchronise all the installed elements (generator, control panel, ligh-
ting).
Once this sequence has been run, all the functions of your Hammam/Turkish bath will be easy to run from the
control panel.
Make sure that the steam generator is connected to the electricity and water supplies.
The Nuvola Smart Power system has an automatic start-up sequence that runs autonomously in the following
situations.
- When the Turkish bath is first powered up
- When a new peripheral device has been recognised.
An automatic start-up sequence is indicated by the On/Off button flashing.
This phase will last for anything from 15 seconds to a few minutes during which the generator will install and
recognise all the other devices (see Fig. A).
fig. A
The On/Off button will stop flashing at the end of the automatic start-up sequence.
10
The data and features referred to are not binding on EFFEGIBI and the company reserves the right to make any appropriate changes
OPERATING AND MAINTENANCE MANUAL
FOR NUVOLA SMART POWER
without having to give prior notice or replace this manual.