Manual Start-Up Sequence - effegibi Nuvola Smart Power Manual De Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATING AND MAINTENANCE MANUAL
EN
FOR NUVOLA SMART POWER

4.2 MANUAL START-UP SEQUENCE

If a previously installed peripheral device has been disconnected it may be necessary to run a manual start-up
sequence.
Switch on the panel by pressing the "ON/OFF" button (Fig. A).
fig. A
The panel will display all the icons with a dim light.
Buttons A and B, the maintenance signal and the EFFEGIBI logo will appear with a brighter light (see Fig. B).
fig. B
A
B
Press the temperature controls, buttons "C" and "A", firmly and in rapid succession, and they will glow brighter, and
then the "ON/OFF" button. In Fig. C the sequence is shown as numbers"1", "2" and "3".
The "ON/OFF" button (shown as number 3) must be pressed firmly for a few seconds until all the control panel
buttons have been flashing for a few seconds.
fig. C
3
C
A
1
2
The data and features referred to are not binding on EFFEGIBI and the company reserves the right to make any appropriate changes
11
without having to give prior notice or replace this manual.

Publicidad

Tabla de contenido
loading

Tabla de contenido