Electrical Installation - DURAVIT Inipi B Super Compact Instrucciones De Montaje

Ocultar thumbs Ver también para Inipi B Super Compact:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 12

Electrical installation

Power supply
Max. nominal output
Fuse protection
RCD
Pre-installation
> Installing a permanent power supply line:
• Pre-connect a separate fuse and
residual current operating device (RCD)
• Pre-connect an all-pole separating main switch
• Allow the supply line to protrude by 3,000 mm
53
Connecting the sauna (Diagram 53)
NOTE! Avoiding any malfunctions!
> Do not fasten the cables together with cable ties.
NOTE!
> Only install the controls definitively after
mounting the centre wall.
> After a function test, protect the controls from
damage during further installation work.
I
Connect the supply line to the controls.
II
Insert and push the cable of the control panel
through the free opening.
55
Checking the functions (Diagram 55)
> Switch on the fuse.
> Check the function of the light and stove.
> Switch off the fuse.
220-240 V, 50/60 Hz
4.1 kW
I
= 20 A
N
I
≤ 30 mA
ΔN
I
L1
N
II
SAUNA_M_Inipi-B-Super-Compact/19.10.8
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

75137514Inipi b

Tabla de contenido