DINAMIC 1.1
EN
GAS LOAD:
Empty the circuit for at least 30 minutes.
17
Introduce 300 g of gas load R134a and start
18
up the equipment.
GENERAL VIEW OF THE
19
CONDENSATION UNIT AND PIPING.
GENERAL VIEW OF THE
20
EVAPORATION UNIT.
32
Air conditioning for vehicles