Installation - Schluter Systems BEKOTEC-THERM-RTBR Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

5.2 Installing Schlüter
-BEKOTEC-THERM-RTBR / RTB
®
Schlüter-BEKOTEC-THERM-RTBR / -RTB must always be installed at the end of the surface heating circuit (see Fig. 15 on page 29).
Fig. 15: Connection
Fig. 16: Schlüter-BEKOTEC-THERM-RTBR / -RTB with fixing brackets
i
1
2
4
3
2
3
4
5
1. Create a branch from the hot flow leg in the dual-pipe heating
2. Install the surface heating circuit.
3. Install the box in the desired position, using mortar or an adhesive
4. Remove the protective cap from the valve for installation.
5. Connect the pipe of the surface heating circuit to BEKOTEC-THERM-
6. Create a connection line from BEKOTEC-THERM-RTBR/-RTB to the
RTB
RTBR
Radiator
Schlüter
-BEKOTEC-THERM-RTBR / RTB
®
Surface heating circuit
Hot flow leg
Return leg
system.
binder. Use the supplied fixing brackets for aligning and attaching
BEKOTEC-THERM-RTBR / -RTB.
i
Install heating circuit in a spiral pattern to achieve even heat
distribution.
Return the protective cap after starting up the system.
RTBR/-RTB.
i
Note the marked flow direction.
return leg of the dual-pipe heating system.
GB
29

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bekotec-therm-rtb

Tabla de contenido