Display; Initial Setup Via Lcs Tool - SMA SUNNY TRIPOWER 60 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY TRIPOWER 60:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3  Initial Setup and Start

3.2 Display

INFORMATION
It may take some time until the display responds after
switching on.
The integrated display on the inverter front gives the user
access to information about the PV system and the inverter.
Figure 3.1 Overview of display buttons and functionality
Display buttons and functionality
Button
F1
F2
F3
F4
Home
OK
Arrow upwards
Arrow downwards
Arrow right
Arrow left
Back
30
STP60-10-IA-xx-11
Function
Adjust the contrast level of
display. Use arrow up/down
button while pressing the F1
button.
No function
Return to main screen
No function
A step up
A step down
Toggles screen right
Toggles screen left
Return to main screen
SMA Solar Technology AG / SMA Solar Technology America LLC
Button
On – green LED
Alarm – red LED
Table 3.2: Display buttons and functionality
The screen design is divided into different sections:
1. Main screen. Current and daily yield. This section
contains:
– Actual output power (kW)
– Yield of the current day (kWh)
– Total yield (kWh)
– Current date
– Current time
– Operating mode (#)
2. Inverter information. This section contains:
– Inverter device type
– Inverter name
– Inverter serial number
– IP address
– Serial number of the SMA Inverter Manager
– Software version of the inverter
3. Actual values. This section contains:
– PV voltage and current
– Phase-to-phase voltages
– Phase currents
– Power frequency

3.2.1 Initial Setup via LCS tool

The STP 60 inverters and the SMA Inverter Manager must
be commissioned via the local commissioning and service
tool (LCS tool). Commissioning is required before the
STP 60 inverters are connected to the utility grid and start to
feed-in power.
The LCS too enables the selection of predefined country
data sets for different utility grids. Customer-specific country
data sets must be provided by SMA and imported via the
LCS tool (see installation manual of the SMA Inverter
Manager / SMA Digital I/O Box / LCS Tool).
After installation, check all cables and close the inverter.
Turn on AC power.
Function
Installation Guide

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido