PACKING, TRANSPORT AND
Only skilled personnel who are familiar with the lift and this manual shall be allowed to carry
out packing, lifting, handling, transport and unpacking operations.
The lift is delivered as many sub-assemblies. The lay-out is referred to the ordered
model.
On-floor installation model:
No. 2 load bearing units, each one with a platform and hydraulic cylinders
No. 1 control unit with hydraulic unit
No. 1 box containing hydraulic lines, connection cables, four rubber blocks, stickers and
technical documentation
No. 4 drive-on ramps (2 front and 2 rear ramps) equipped with protective devices to connect
platforms
In-ground installation model:
No. 2 load bearing units, each one with a platform and hydraulic cylinders
No. 1 control unit with hydraulic unit
No. 1 box containing hydraulic lines, connection cables, four rubber blocks 40 mm in height,
stickers and technical documentation
No. 2 - 3 covers for pit covering
Optional accessories are available on request, to satisfy each customer
accessory manual and price lists).
The lift is packed in a single box on a wooden pallet, wrapped up in anti-scratch waterproof
material and sealed with 2 metal straps.
The average weight of the package is 1000 kg.
When loading/unloading or handling the equipment at the customer
suitable loading (e.g. cranes, trucks) and hoisting means. Moreover, make sure to hoist and
transport the components in a safe way so that they cannot fall, taking into consideration the
package size, weight and centre of gravity and its fragile parts.
CHAPTER 3 -
STORAGE
3.1 Packing

3.2 Lifting and handling

'
s requirements (Ref.
'
s site, make sure to use