Maintenance at
-
every start-up
-
In addition to the above list of steps to be carried out at every start-up, for water-cooled
welding torches:
-
-
Disposal
Materials should be disposed of according to valid local and national regulations.
52
Check wearing parts, replace faulty wearing parts
Purge the gas nozzle of welding spatter
Ensure that all coolant connections are leak-tight
Ensure that there is a proper coolant return flow