Important Information On Installation And Putting Into Operation - RK Rose+Krieger SLZ 63 Manual De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7.3 Important information on installation and putting into operation

It is essential that you note and observe the following instructions. Otherwise persons
could be injured or the electric cylinder or other components could be damaged.
No additional holes may be made in the electric cylinder.
The electric cylinder is not to be used outdoors.
The electric cylinder must be protected against the ingress of moisture.
The electric cylinder must not be blocked. Risk of mechanical damage.
The end positions of the electric cylinder must not be used as lifting position limits.
The electric cylinder must not be opened.
The operator must ensure that there are no risks when the supply is connected.
When designing tables, etc. take care to avoid crushing and shear points. These are to be protected
appropriately.
If a fault causes the electric cylinder to run on its own, this must be immediately stopped by isolating
the supply line.
If the supply line is damaged, the electric cylinder must be taken out of use immediately.
The electric cylinder must not be under tension during assembly.
Never touch the terminal box.
Defective supply lines must be immediately swapped for new, undamaged ones.
All work on the electric cylinder must be completed when it is in a de-energised state.
7. Life phases
63

Publicidad

Tabla de contenido
loading

Tabla de contenido