Packing and unpacking
The machine is packaged in cardboard with
polyester foam inserts to guarantee full
integrity during transport.
•
Handle the packaging according to the
instructions.
•
Open the packaging and check the
integrity
of
all
packaging for future moves.
•
Lift the machine as indicated and place it
in the installation area.
Installation area
The arranged area must be suitably illuminated and an electrical socket must be available. The resting surface must be
sufficiently ample, even and dry. The fry top must be installed in rooms with non-explosive environments. In any case,
installation must also be performed in consideration of the work safety laws in force.
Room conditions table
Descriptions
Working temperature
Storage temperature
Relative humidity
Dustiness
Electrical connections
DANGER – WARNING:
Electrical connections to the supply
mains must be performed by
specialised personnel.
Verify the efficiency of the grounding
system in the building. Make sure that line
voltage (V) and frequency (Hz) correspond
to
those
of
the
machine
identification plate and wiring diagram). The
machine is equipped with an electrical plug
which should be connected to a built-in
(wall) circuit breaker with grounding.
Three phase connection
In models MSD554C-775C-776C the
lack of air suction accompanied by an
eccessive amount of noise coming from
the machine is due to incorrect pump
rotation. Therefore unplug the machine
and invert two of the three phases of
the plug.
MSD300P-300-400-500
components.
Keep
Maximum 95% with room temperature between 5÷40 °C (41÷104 °F)
MSD300P-300-400-500
MCD300-400-450-444C
(See
the
INSTALLATION
INFORMATION
MCD444C-554C-755C-776C
Values
5÷40 °C (41÷104 °F)
5 to 40 °C (from 41 to +104 °F)
Less than 0.03 g/m³
2
MCD300-400-450
MCD554C-755C-776C