Instructions For Initial Switch-On; Getting Started - Fulgor Milano FCO 300 P TM 2F Instrucciones Para La Instalación Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 155

Instructions for initial switch-on

Once the oven has been connected to the power supply for
the first time, the control automatically prepares for setting a
number of user settings, which remain stored in case of any
subsequent switch-on.
NOTE Both at the first and subsequent connections to the
power supply, the door lock mechanism performs a
calibration run – in this phase, always keep the door
closed.
• Language
• Temperature & Weight
• Time
• Date
Refer to the USER SETTING paragraph for setting instructions.
After making the user settings, the control moves automatically
to the "Standby" display page.

9 - Getting Started

EN
13

Publicidad

Tabla de contenido
loading

Tabla de contenido