Install The Unit - Thermador PROFESSIONAL VCIN36JP Manual De Instalación

Ocultar thumbs Ver también para PROFESSIONAL VCIN36JP:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Build housing framework
a) Refer to "General Information" on page 4 for the
applicable model dimensions.
b) Refer to "Installation Preparation" on page 5 for
clearance specifications.
c) Build housing framework for applicable model
according to dimensions in "Preparing the Ceiling
Cutout and Housing" beginning on page 15.
4. Install blower motor
a) Refer to "Blower Motor Installation" beginning on
page 10.
5. Hood liner installation
a) Slide the liner onto the hood (Figure 33).
b) Hold liner flush to the bottom of the housing.
Secure the liner to the hood with eighteen (18) x
(9.5 mm) screws, as indicated in Figure 34 and
Figure 35.
Figure 32: Liner
Figure 33: Liner Installation
''

6. Install the unit

a) Install the custom insert inside the custom housing.
b) Secure to the rear of the frame using six (6) 1''
(25.4 mm) mounting screws provided (Figure 36).
⅜" (9.5 mm)
x 3 each side
Figure 34: Secure Liner Sides
⅜" (9.5 mm)
X 6 each front
& back side
Figure 35: Secure Liner Front & Back
1'' (25.4 mm) X 6
mounting screws
Figure 36: Rear Screws
English 21

Publicidad

Tabla de contenido
loading

Tabla de contenido