Chassis Wiring and Preparation (Non ATEX)
PROVIDED HARDWARE
1 JUNCTION BOX
2 MOUNTING LEGS
2 LEG SCREWS
2 HOLE COVERS
1 STAINLESS STEEL
GROUND SCREW
2 SCREWS
1 SHEET METAL SCREW
STEP1 Remove the junction box, cover and screws from the shipping position underneath the fan motor (See Figure 7). Install one
junction box mounting leg in the upper left position facing the rear of the junction box. (Figure 27)
Figure 27
STEP2 Remove and discard the threaded bushing wire protector from the conduit connector on the side panel of the control
compartment. Install field supplied cable gland as required. Strip the wires approximately 1/2 inch (13 mm).
Figure 28
21