1.4
SHIPPING
"RS Mk.II" thermal units are supplied
in three separate packs:
PACK N. 1
Cast iron body strapped onto pallet,
complete with:
– n° 2 flanges with 2" collar for hea-
ting system delivery and return
– n° 1 blind flange
– n° 1 flange with 3/4" connection for
drain cock
– n° 2 combustion chamber doors
with cast iron indicator door
– n° 2 sheaths for thermostats and
thermometer
– n° 1 water distributor located in the
boiler return manifold, supplied in
two different lengths:
L = 406 mm vers. "129÷194"
L = 851 mm vers. "215÷279".
1.5
FRONT INSIDE VIEW
1
2
3
4
PACK N. 2
Wooden crate containing:
– flue gas chamber to be assembled
– cardboard box containing skirt
– main burners, one for each element
in the body minus one
– burner manifold
– plastic bag containing:
• n° 13 tornillos M5 x 8 screws for
anchoring burners to manifold
• n° 32 self-tapping 12E x 1/2"
screws for fastening various parts
of the flue gas chamber and skirt
• n° 4 M8x30 screws with plate, flat
washer and M8 nut for anchoring
flue gas chamber to boiler body
• n° 1 3/4" drain cock with cap.
PAQUETE n° 3
Cardboard box containing:
– Gas assembly, comprising:
• main gas valve with coil unit
• gas pressure switch
• pressure intake
• second gas solenoid valve
– Electric control panel, consisting of:
• BRAHMA SM 191. 1 control device
• interference filter
• ignition and detection electrodes
• sockets for connection with con-
trol panel
• anchoring screws
– Control panel consisting of:
• two-step control thermostat
• manually reset safety thermostat
• thermometer
• gas pressure indicator light
• device shutdown indicator light
• illuminated main switch
• anchoring screws.
5
6
7
KEY
1 Electrical control panel
2 Gas pressure switch
3 Second gas solenoid valve
4 Pressure intake
5 Control panel
6 Bulb housing sheath
7 Gas valve
Fig. 2
59