MAAX 10049110 Guia De Instalacion página 6

Para bañera, ducha y bañera-ducha
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Lift the frame assembly and position
1
it on the base. Center the frame
from left to right, as illustrated in the
figure.
note: By positioning the frame over the
base, the wall posts can be pushed
further back inside the panel posts.
The rail ideal position should be on the base
threshold centerline, as illustrated.
Using a pencil, mark all attachment
4
hole locations, as illustrated in
the figure.
2 - WaLL Post PositioNiNG aNd iNstaLLatioN
Using a pencil, makes sure that
2
the wall posts are plumb, and mark
a line with a pencil inside the wall
post to mark its position on the wall, as
illustrated in the figure.
Repeat for both sides
While a person holds the shower frame
in position, the other should makes sure
that wall posts are in contact with the wall.
If required, wall posts can be removed or
inserted. Remove the shower unit from
the base and remove the wall posts from
the panel posts.
Remove the wall posts and drill
5
holes at each attachment location,
as illustrated in the figure.
For installation on ceramics tiles, use a
1/4"masonry bit.
Using a center punch, punch the ceramics
surface at the location of the attachment
points. Drill, then insert plugs.
For installation on an acrylic enclosure,
use a 1/8"bit. Plugs are not required.
3
the pencil marks, as illustrated on the
figure.
Note:The bottom of the
wall posts must be filed
to adjust for installation
on a single-hull unit.
6
Reinstall the wall posts and attach
them to the wall with #8 x 1", screws,
as illustrated in the figure. Wall posts
are equipped with for better horizontal
adjustment.
6
Reinstall the wall posts on the wall
at the marked location. The wall
post lower edges must align with
+45º
Wall bracket
front view.

Publicidad

Tabla de contenido
loading

Tabla de contenido