Step 3 - Primary Start-Up And Check Of The System; Check Correct System Wiring - Nice Free-Max Instrucciones Y Advertencias Para La Instalación Y El Uso

Ocultar thumbs Ver también para Free-Max:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 74
a1
b1
[B]
[A]
C - E
c1
d1
[A]
3
[E]
[C]
[A]
5
[A]
[C]
[D]
4
C -
E
e1
[E]
C - E
6
with a distance of at least 3 mm between contacts
(e.g.: switch, plug, etc). This device guarantees
fast and safe disconnecting of the tubular motor
when necessary.
Note – The cut-out device is not supplied with the
product.
3
STEP 3 – Primary start-up
and check of the system
CHECK CORRECT SYSTEM
3.1
WIRING
Once installation and wiring have been completed,
a simple check must be performed to ensure that
the system is operating correctly before going any
farther.
Therefore, turn on the power supply to the automa-
tion and check to see if the motor performs 2 short
motions (the rotation direction is not important):
this confirms that the automation has been correct-
ly connected.
English – 7

Publicidad

Tabla de contenido
loading

Tabla de contenido