Joannes GIG 107 Manual De Instrucciones página 21

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

GIG
INSTRUCTIONS FOR FITTING THE COVER AND INSTRUMENT PANEL TO THE "GIG" BOILER
1)
Unscrew nuts 1,2 and 3 and loosen nuts 4 and 5 (fig. 3).
2)
Fit the right hand slots of the front / lower metal plate A between the boiler walls and nuts 4 and 5.
Once they are in position fix everything into place by tightening nuts 2, 3, 4 and 5 (fig. 4).
Fig. 3
Fig. 4
21

Publicidad

Tabla de contenido
loading

Tabla de contenido