Setting Up For Installation - Dalla Corte MINA Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Setting up for installation

The machine shall be placed on a surface that
provides secure support.
When arranging the systems, a 10 x 10 cm hole
(A Pic.1) shall be made in the support panel so
that machine can be connected with the systems
beneath the counter space (B Pic.1).
The machine must be connected exclusively to
an appropriate cold drinking water source, in
compliance with national norms and rules.
The pressure of the incoming water must be
between 0.1 and 0.6 MPa. If this requirement is
not met, consult the manufacturer. A shut-off tap
must be installed between machine water hose
and water system to block water flow in case of
necessity (1 Pic.1).
Connect the drain siphon (5 Pic.1) with a minimum
diameter of 40 mm to the drain system of the
place of installation.
Pic.1
A
1
2
4
3
5
LEGEND
1 Water tap
6
2 Flexible water hoses
3 Water softener (optional)
4 Drain hose
5 Drain siphon
6 Electric supply cable
7 Single phase electric SCHUKO
7
plug 16 A
B
A Hole on support panel
B Under-counter space
| 27

Publicidad

Tabla de contenido
loading

Tabla de contenido