Installation Instructions
Blower Motor Installation
B
LOWER
Integral Blower 600 CFM
Integral Blower 1000 CFM
Remote Blower 600 CFM
Remote Blower 1000 CFM
Remote Blower 1300 CFM
Inline Blower 600 CFM
Inline Blower 1000 CFM
* CFM= Cubic feet per minute
Integral blower installation only
1. The blower is attached to the hood using weld studs
provided on the mounting plate. Figure 5 exhibits the
weld stud locations.
2. Guide the motor mounting plate over the studs.
3. Attach four (4) nuts (included with hood) to the weld
studs. Tighten nuts to secure the blower to the hood.
4. Continue to "Wiring the Hood with an Integral Blower"
on page 12.
SKU
CFM*
VTN630C
600
VTN1030C
1000
VTR630D
600
VTR1030D
1000
VTR1330E
1300
VTI610D
600
VTI1010D
1000
B
LOWER
V
OLTAGE
C
URRENT
(AC)
(AMPS)
120
2.7
120
5.4
120
4.2
120
5.7
120
8.5
120
4.2
120
5.7
Table 5: Blower & Circuit Breaker Ratings
x4
Weld Studs
Figure 5: Weld Stud & Junction Box Locations
C
IRCUIT
B
REAKER
(AMPS)
15
15
15
15
15
15
15
Knockouts
behind
junction
box
English 11