6
Commissioning
Commissioning via the diagnosis terminal
Commissioning steps
Terminal
A1U
DI1
DI2
DI3
DI4
DI5
3. Check switch at the bottom of the drive unit:
DIP1/1 must be "OFF" (Lenze setting) in order that the parameters can be
overwritten via »Engineer«, keypad, or fieldbus.
4. If required, carry out communication settings via the DIP switch on the
Communication Unit for fieldbus communication.
The communication settings depend on the fieldbus used.
5. Fasten the controller by means of the 4 screws.
6. Switch on voltage supply of the inverter.
7. Connect keypad.
–
Remove the cover of the diagnostic interface on the top of the device
and connect the keypad to the diagnostic interface.
–
When the keypad has been connected, the connection to the inverter is
established. This process is completed when C00051 is shown in the
display.
98
Function
Info
Setpoint selection 10 V º 1500 rpm (with 4−pole motor)
general: 10 V º 100 % reference speed (C00011)
JOG 1
Selection of preset setpoints 1 ... 3
If both inputs are on LOW level, the setpoint selection
l
JOG 3
JOG 2
via the analog input A1U is active.
DCB
Manual DC−injection braking (DCB)
For HIGH−active inputs, DC−injection braking is active
l
as long as DI3 is at HIGH level.
After the hold time (C00107) has expired, the inverter
l
sets pulse inhibit (CINH). DC−injection braking (Î
110)
R/L
LOW level: CW rotation
HIGH level: CCW rotation
Holding brake
Open/close holding brake
Braking modes C02580
l
l
EDK84DGDVBxxx4 DE/EN/FR/ES/IT 8.3