Hydraulic Connections - Enerpac VLP-Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 21
upper
bed
upright
bolster
pin
lower
bed
Figure 1, VLP Press Assembly
3.0 INSTALLATION (Refer to Figure 1)
WARNING: Install proper safety equipment (i.e.,
guards or control devices) as required for your
specific application.
3.1 Press Mounting
WARNING: Mount the press securely. Unstable
positioning may cause the press to tip, resulting in
serious personal injury or equipment damage.
If the press is to be mounted to the floor or some other
foundation, lower press bed to lowest set of holes before drilling
and bolting down. This will ensure that the press does not twist
and that the bed will line up with all sets of holes in the legs.
3.2 Mounting Pump Table
Attach Pump Table to Upright with hinge pin provided.
3.3 Securing Pump to Mounting Table
Attach pump to table (use screws, washers and nuts provided in
the kit) by matching mounting hole pattern.
1.
Mount Electric Pump to table at two locations using
provided hardware. See Figure 2.
1 – 3/8-16 x 1.50" long bolts required (Qty. 2)
Figure 2a, PUJ1200B/PUJ1201B Econo-pump
pump table
1
Front of press
hose
pump
gauge
2.
Mount Hand Pump to table at two locations using provided
hardware. See Figure 3.
1 – 5/16-18 x 1.00" long bolts required (Qty. 2)
3.
Mount Hand Pump to table at four locations using provided
hardware. Use brackets to fasten the pump head. See Figure
4.

3.4 Hydraulic Connections

1.
Connect the Hose(s) from the Pump to the Cylinder.
2.
Tighten all couplers and fittings.
NOTE: Use 1
leaving the first complete thread free of tape to ensure that
pieces of tape do not enter the hydraulic system, causing
leakage or damage.
3
Front of press
Figure 2b
1
Front of press
Figure 3, P-80 Hand Pump
Figure 4, P-802 Hand Pump
1⁄2
wraps of Teflon tape on the NPTF threads,

Publicidad

Tabla de contenido
loading

Tabla de contenido