Commissioning; Functional Test - Festo ZSB-1/8-B Instrucciones De Utilizacion

Ocultar thumbs Ver también para ZSB-1/8-B:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ZSB-1/8-B
Pneumatic connection
Inputs 1
and 1
1
2
Output 2
Output 3
Tab. 1
6

Commissioning

1. Pressurize your system.
2. Screw in the opened adjustment screw of the pressure sequence valve (e.g. VD-3-PK-3) until the
switching pressure is at least 4 bar. An inspection can be conducted, for example, using a pressure
gauge.
3. Implement a functional test (è chapter 6.1).
6.1

Functional test

1. Apply the desired supply pressure p
2. Supply inputs 1
and 1
1
3. At each step check to make sure outlet port 2 behaves as shown in Fig. 5.
Fig. 5
Performance test, step 1 to 15
Note
The time delay between step 7 and 8 is dependent on the supply pressure and ranges
between 0.25 and 0.5 s.
Festo – ZSB-1/8-B – 1603a English
Component
3/2-way push-button valves
Control input of the following
control chain
– Without connection or
– silencer if required
to the product.
0
gradually with pressure as shown in Fig. 5.
2
Connection size
Gx
x
G
x
G
17

Publicidad

Tabla de contenido
loading

Tabla de contenido