Installation
5
Installation
5.1
Installation site (Qualified specialist)
5.1.1
Assembly site
Select the assembly site and prepare it in accordance with
Fig. 4. If the unit is being used in an above ground pool, the
telescopic support foot must be used, for attachment
instructions See "Fig. 5" on page 20.
5.1.2
Installation position
The unit is normally installed on the narrow side of the pool
with a recommended minimum pool length of 4 m.
From a pool width of 4 m, installation on the longer side is
also possible.
For round and oval pools made from smooth sheet steel or
plastic, a minimum radius of 2 m is required.
For round and oval pools made from made from stone or
concrete, a flat surface with a minimum width of 480 mm is
required.
The water depth at the position of installation should be
between 1.2 m and 1.5 m. Thus the massage hose can be
used appropriately and optimally.
5.1.3
Checklist
Check the unit contains all parts listed in the packing list.
5.1.4
Fastening the unit to the ground
Set the unit on the edge of the pool and mark the mounting
holes.
5.1.5
Drilling the mounting holes
Lift the unit and drill the Ø10 mm holes on the markings. See
"Fig. 4" on page 19
5.1.6
Inserting the brass dowels
Insert brass dowels (25) and screw on the metal vibration
buffers (26). See "Fig. 6" and "Fig. 7" on page 21.
Ensure that the bolts anchor the buffers securely into the
base, so that the unit sits securely.
18 EN
09|2018