Jet Housing Installation - Liner and/or Fiberglass Pool Construction - continued
6. Align the clamping ring (part# 28) over the clamping
ring gasket (part#27).
7. Install the twelve (12) M8 x 30 clamping ring screws
(part# 52).
8. Follow steps 1-4 under Jet Housing Installation - New
Gunite or Concrete Construction on page 9 - 10.
9. Continue to Final Assembly Section on page 16.
NOTE: The gunite cover (part# 30), M8 x 80 studs (part# 31),
8.4mm washers (part# 32), and M8 nuts (part# 33) are used
in those cases where the swimming pool is commissioned
without the final assembly kit being installed.
CAUTION: All screws should be HAND TIGHT. DO NOT use
drills or pneumatic tools. DO NOT over tighten!
Figure 12
Fiberglass Pool Installation
Figure 13
Liner Pool Installation
Figure 11
Template for fiberglass/vinyl liner pools
Fiberglass pool
1
26
Liner pool
1
26
14.0"
15°
1) Fasten to clamp ring (12x)
30
27
33
31
28
32
30
27
33
31
28
52
32
WATER LEVEL
1)
13.3"
0.3"
52
15