Final Works; Preparing The Commissioning Procedure - Lenze L-force 9400 Instrucciones Para El Montaje

Módulos de eje
Ocultar thumbs Ver también para L-force 9400:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

8

Final works

Preparing the commissioning procedure

8
Final works
8.1
Preparing the commissioning procedure
You need the following for commissioning:
Keypad EZAEBK0001
ƒ
or
Computer with Windows® operating system (XP or 2000)
ƒ
Lenze PC software »Engineer«
ƒ
Connection with the controller via an interface, e.g.
ƒ
– Diagnostic interface X6 with USB diagnostic adapter
– System bus (CANopen)
– Communication module
Software manual for the technology application used
ƒ
The communication manual for the network of the automation platform
ƒ
Mains voltage or 24−V voltage supply for the control electronics of the controller
ƒ
Follow the instructions of the software and/or read the documentation.
86
l
EDK94SH104 DE/EN/FR/ES/IT 8.0

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

L-force e94 serie

Tabla de contenido