EdilKamin IDROPELLBOX Instalación Uso Y Mantenimiento página 30

Ocultar thumbs Ver también para IDROPELLBOX:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 62
E ternal
inta e
NOTES ON FITTING THE COVERING
using a pre a ricated Edil amin covering, n order to de ne
the e act position o the D
to chec
hich covering ill e used to complete it.
ositioning di ers according to the model chosen see assem-
l instructions given in the pac aging o each covering .
Al a s chec that installation is per ectl vertical and horizon-
tal.
e ore installing the covering, chec that all connections,
commands and moving parts are per ectl
Chec this ith the oiler- replace on and or ing or a e
hours. Do so prior to tting the covering in order to intervene
as necessar .
inishing or s, such as construction o the counter-hood,
covering assem l , pilaster preparation, painting, etc.,
should e carried out once the nal test has een passed.
Edil amin ill there ore not e held lia le or an charges
deriving rom oth demolition and reconstruction or s,
even here consequent to replacement o an
replace parts.
INSTALLATION
*
nternal mantel
ventilation grilled
arm air outlet
at the ront
*
ec cled air inta e
E
, it is important
unctional.
ault
oiler-
N.B.: IMPORTANT FOR INSTALLATION CONDITIONS
There must e t o ventilation grilles sur aces greater than
300cm
the rst must e at a height hich is lo er than the
hearth, hile the second must at a height greater than 30 cm
ith respect to the upper pro le o the outlet.
These grilles prevent the accumulation o heat inside, hich is
then used to help heat the room o installation.
ather, at least 1 cm. appro . space must e le t to allo
air to o , there
preventing heat rom accumulating. The
counter-hood can e created rom reproo plaster oard panels
or plaster sheets.
hen creating this, the air circulation grill
must e included, as previousl speci ed.
During the construction phase of the covering it is funda-
mental to ensure that the combustion air is restored
to prevent pressure phenomena in the room where the
the external air inlet on page 29)
In addition to the above, always consider the indica-
tions given by paragraphs 4.4 and 4.7 of standard UNI
recommendations".
CREATING THE MANTEL
plasterboard or gypsum board.
aeration grilles for preventing any excess temperature
inside must be provided for during construction.
- 30
-

Publicidad

Tabla de contenido
loading

Tabla de contenido