C
GM 3100 PRO
ONNECTIONS TO
Follow the instructions below in order:
open the door
remove the terminal cover panel positioned under the switches (see "Front UPS views" )
connect the protective conductor (ground cable) to the PE marked screw.
connect the input, output and battery cables to the terminal board, observing the positions and polarities indicated in
the figure below. Connect N BATT, N INPUT and N OUTPUT cables to the neutral bar.
Note: PE M6 screw, N M8 screw
Once installation operations have been completed and connections verified (see paragraph "First start-up and initial settings"),
restore the terminal cover panel and close the door.
MODEL WITH STANDARD BYPASS
75