1 Introduction
1.3 Unpacking
Check the scope of delivery of each product for
completeness and any externally visible damage.
Contact your distributor if the scope of delivery is
incomplete or damaged.
The delivery may contain parts
that are not required for the installation.
Contents:
• Inverters
• Wall mounting bracket
• Accessories bag containing:
– 6 wall plugs 8 x 50 mm
– 6 mounting screws 6 x 60 mm
– 1 M25 cable gland with sealing grommet for
Ethernet cables
– 1 grounding bolt M6 x 12 mm
• Installation manual
• Quick reference guide for installation
1.4 Inverter type label
The type label uniquely identifies the inverter. You will
require the information on the type label to use the product
safely and when seeking customer support from the
SMA Service Line. You will find the following information on
the type label:
• Device type (Model)
• Serial number (Serial No.)
• Date of manufacture
• Device-specific characteristics
20
STPS60-IA-xx-12
1.5 Installation Sequence
1. Pay special attention to the important safety
information at the beginning of this manual.
2. Mount the inverter according to Section 2.1, page 22,
Section 2.2, page 23, Section 2.3, page 24.
3. Open the inverter in accordance with Section
2.5, page 25.
4. Install the AC supply in accordance with Section
2.6, page 25.
5. Install Ethernet in accordance with Section
5.7, page 45.
6. Close the inverter in accordance with Section
2.5, page 25.
7. Switch on the DC load-break switch.
8. Turn on AC.
9. Switch on the battery.
10. Finalize commissioning by using the Local
Commissioning and Service Tool (LCS-Tool). The tool is
available from the download area at
www.SMA-Solar.com. The hardware requirements for
the LCS-Tool are:
– PC with Windows
– 1 GB HDD
– 2 GB RAM
The LCS-Tool must be installed on a local PC drive. The
PC must be connected to the system network of the
SMA Inverter Manager. See Section 3.2.1, page 31
for configuring via the LCS tool.
11. Verify the installation by:
– Inverter display: LED "On" is permanently green.
– LCS-Tool: In the inverter view, the status is
"On grid".
– Battery status via the SMA Inverter Manager
12. The inverter is in operation now.
SMA Solar Technology AG
TM
7 and later
Installation Manual