Kalor Cloe 17B Manual De Instrucciones página 57

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hydro insert assembly
Pedestal fi xing (Optional)
If you have bought the fi replace insert pedestal, fi rst you
have to fi x it to the fl oor and choose the height of the legs.
If you install the lateral load, it is advisable to keep the
minimum size so as not to have the loading entrance too
high.
Side loading system (Optional)
The assembly of the side loading system must be done
before the construction of the fi replace insert coating.
Now fi t the side loading tank in the coating and connect
the hose.
If you have purchased the fi replace insert pedestal, fi rst you
have to fi x it to the fl oor and choose the height of the legs.
Fix the fi replace insert to the base or to the pedestal using
the fi xing screws (not supplied). If the fi replace is already
existing, the side openings for access must be provided.
Fixing screws
Fixing screws
Connect the fl exible hose to the loading tank present on
the tank calculating the useful length of the pipe with a
minimum inclination of 50°.
101

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Petra 25bIcpidro17Icpidro25

Tabla de contenido