Installation Layout; Preliminary Operations; Preparatory Steps - Erreka AXIL Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

AXIL operator
Blinker
Aerial
Key or digital selector
Safety edge (EN 12978)

PREPARATORY STEPS

The new series of operators AXIL, has been devised to serve gates up to 300 Kg with leaf up to 2,8 meters wide.
Before proceeding with the installation, please make sure that your gate opens and closes freely, and that:
• Hinges and pins are in optimum condition and properly greased.
• No obstacles are within the moving area.
• There is no friction with the ground or between the leaves.
• Your gate is equipped with a central latch.

INSTALLATION LAYOUT

- cable 4 x 0,75 mm
2
(120V/230V)
- cable AYCY4 (24V)
cable 2 x 1,5 mm
2
cable RG-58
cable 3 x 0,5 mm
2
- optical type
- resistive type
Internal photocells
External photocells
Control unit
19
cable 4 x 0,5 mm
2
(RX)
cable 2 x 0,5 mm
2
(TX)
cable 4 x 0,5 mm
2
(RX)
cable 2 x 0,5 mm
2
(TX)
cable 3 x 1,5 mm
2

Publicidad

Tabla de contenido
loading

Tabla de contenido